geo.wikisort.org - River

Search / Calendar

The Worcester and Birmingham Canal is a canal linking Birmingham and Worcester in England. It starts in Worcester, as an 'offshoot' of the River Severn (just after the river lock) and ends in Gas Street Basin in Birmingham. It is 29 miles (47 km) long. There are 58 locks in total on the canal, including the 30 Tardebigge Locks, one of the longest lock flights in Europe. The canal climbs 428 feet (130 m) from Worcester to Birmingham.

Map of the Worcester & Birmingham Canal and connecting waterways (zoom in for details)
Map of the Worcester & Birmingham Canal and connecting waterways (zoom in for details)
Worcester and Birmingham Canal
Legend
BCN Main Line
Gas Street Basin
(Worcester Bar)
Holliday Street aqueduct
86
A4540 Middle Ring Road
Edgbaston Tunnel
(105 yd)
81
Cross-City Line
Dudley Canal
Selly Oak Jn
Ariel Aqueduct
80
A38 Bristol Road
79
Cross-City Line
75
A441 Pershore Road
74
Camp Hill Line
Stratford-upon-Avon Canal
Wast Hills Tunnel
(2726 yd)
67
A441 road bridge
Upper Bittell Resr and feeder
Lower Bittell Resr
M42 road bridge
Crown Meadow Arm
Shortwood Tunnel
(613 yd)
Tardebigge Tunnel
(580 yd)
Tardebigge Wharf
Tardebigge Resr / engine house
29-58
Tardebigge Locks (30)
23-28
Stoke Locks (6)
17-22
Astwood Locks (6)
37
Railway bridge
Droitwich Canal
35
B4090 Hanbury Road
Dunhampstead Tunnel
(230 yd)
24A
M5 road bridge
11-16
Offerton Locks (6)
22A
A449 bridge
5-10
Locks (6)
4
Blockhouse Lock
3
Sidbury Lock, Worcester
Diglis Basins and dry dock
1-2
wide beam locks (2)
River Severn

The canal also has connections with the Stratford-upon-Avon Canal, and the restored Droitwich Canal, it historically linked to the Dudley Canal Line No 2, until the route through the Lapal Tunnel was abandoned in 1917.


History


The start of the Worcester and Birmingham Canal at Gas Street Basin, looking south-east, towards The Mailbox
The start of the Worcester and Birmingham Canal at Gas Street Basin, looking south-east, towards The Mailbox
Worcester and Birmingham Canal locks. Feb. 2007
Worcester and Birmingham Canal locks. Feb. 2007

The parliamentary bill permitting its construction was passed in 1791 empowering the company to raise £180,000 (equivalent to £23 million in 2021),[1] through 1,800 shares at a cost of £100 each. It also allowed them to raise a further £70,000, if needed, amongst themselves or by the mortgage of tolls and rates. The Act also permitted the company to allow landowners on the line to build wharfs and wharfhouse, and if they refuse to, the company are allowed to if needed. A further Act of Parliament authorised the raising of £149,929 amongst themselves or through the creation of new shares. However, the company were unable to raise the full amount of money authorised by the second Act, and so another was passed allowing them to raise £49,680. Another Act was passed to obtain more money in 1808. This Act empowered the company to raise £168,000 through the creation of 4,200 shares at £40 each. A final Act was passed in 1815 after the company had purchased land for reservoirs, which was not permitted in the previous Acts. The Act permitted the company to sell the land and to pay a debt of £29,096 (equivalent to £2,290,000 in 2021),[1] to the treasurers by 29 September 1815 as well, otherwise it would be taken out of the proceeds raised from selling the land.

The canal was surveyed by Josiah Clowes and John Snape. Its engineers changed often, and included Thomas Cartwright, John Woodhouse and William Crosley.

Construction of a double barge-width (14 ft) canal began in 1792 from the Birmingham end, but progressed slowly. Selly Oak was reached in October 1795 and Kings Norton Junction by May 1796, meeting the new Stratford-upon-Avon Canal which had by then reached Hockley Heath. By March 1797 the 2726 yard (2493 m) Wast Hills Tunnel was open and the canal was trading to Hopwood. In 1807 the canal reached Tardebigge without the use of locks. From Worcester Bar to Tardebigge top lock, the canal is at the 453 ft Birmingham Level. The cost of building 14-foot (4.3 m) locks was too great so the 56 locks down to Worcester were built to the narrow 7-foot (2.1 m) specification, with the final two locks connecting to the Severn in Worcester being 14-foot (4.3 m) to allow river craft access to Diglis Basin.

The final 16 miles (26 km) was opened in December 1815. Plans to construct basins at Lowesmoor and Diglis were carried out eventually.

Worcester and Birmingham Canal signpost.
Worcester and Birmingham Canal signpost.

The Dudley Canal Line No 2 was built through the Lapal Tunnel to meet the canal at Selly Oak in 1798. After repeated collapses, the tunnel was finally abandoned in 1917 leaving a short stretch navigable between Selly Oak and a brick works at California until 1953, after which it was drained and filled in. A campaign group, The Lapal Canal Trust, is working to restore it, with a diversion around the tunnel.[2]

A major user of the canal was the Cadbury chocolate factories at Bournville and Blackpole, Worcester.


Birmingham terminus


For twenty years direct connection to the Birmingham Canal Navigations (BCN) was prevented by the Worcester Bar, a physical barrier at Gas Street Basin, Birmingham designed so that the BCN would not lose water to the Worcester and Birmingham. Cargoes had to be laboriously manhandled between boats on either side. In 1815 an Act allowed the creation of a stop lock and the bar was breached. The Worcester and Birmingham raised their water level by six inches to minimise water loss and today the two pairs of lock gates have been removed. There were separate toll offices either side of the bar for the two canal companies. The bar still exists, with boats moored to both sides of it.

The commercial terminus in Birmingham was Worcester Wharf, a large complex extending from the bar along Bridge Street, Gas Street and Granville Street. Part of it now forms a water front to The Mailbox shopping and residential complex.


Birmingham West Suburban Railway


After the development of the new Birmingham New Street, a group of local business men noticed the resultant need for additional railway capacity south, through what were the under developed suburbs of south Birmingham and villages of northern Worcestershire. They therefore proposed development of a new branch railway, following the route of the Worcester and Birmingham Canal south to the Birmingham and Gloucester Railway to allow access to their new station at Kings Norton.

Needing finance for construction of the BWSR, the newly formed Midland Railway became involved in the deal. An eventual agreement was reached with the then loss making canal company, who would be paid a rent for the land, which later became a guarantee of a 1% share dividend.[3] The payments to the canal company and development began in 1873, and the line was running by 1875. Originally the railway terminated at Granville Street station and later the Central Goods station and goods yard through a tunnel under the canal, both stations now demolished and built upon.

Today it forms a large part of the southern section of the Cross-City Line which runs in another tunnel under the canal adjacent to the Holliday Street Aqueduct.


Today


Aerial view of the new railway bridge (nearest to camera) and Ariel Aqueduct, over the diverted A38, taken in January 2013
Aerial view of the new railway bridge (nearest to camera) and Ariel Aqueduct, over the diverted A38, taken in January 2013

At Selly Oak, a new aqueduct, the Ariel Aqueduct (named after the former Ariel Motorcycles factory nearby), was constructed in 2011 to carry the canal over a new section of the A38.[4]

The canal is popular for leisure and has narrowboat hire centres at Alvechurch, Worcester, Tardebigge, Dunhampstead and Stoke Prior.

The canal forms part of the Stourport Ring, a popular cruising circuit for holiday boating. The ring takes in parts of four waterways, is 74 miles (119 km) long, and includes 105 locks. Another ring which includes the Worcester and Birmingham Canal is the Avon Ring, which is 109 miles (175 km) long with 129 locks, and also includes parts of four waterways.


See also



References


  1. UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth. Retrieved 11 June 2022.
  2. "The Lapal Canal – Project Summary". Lapal Canal Trust. Retrieved 26 February 2018.
  3. "Timeline - Railways in King's Norton". kingsnorton.info. Retrieved 16 June 2010.
  4. Elkes, Neil (28 December 2010). "Giant trucks wheel Selly Oak rail bridge into place". birminghammail.co.uk.






Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2024
WikiSort.org - проект по пересортировке и дополнению контента Википедии