Geehi Dam is a major ungated rockfill embankment dam across the Geehi River in the Snowy Mountains of New South Wales, Australia. The reservoir impounded by the dam is known as Geehi Reservoir.
Geehi Dam | |
---|---|
![]() Wall and spillway. | |
![]() ![]() Location of Geehi Dam in New South Wales | |
Country | Australia |
Location | Snowy Mountains, New South Wales |
Coordinates | 36°18′16.8″S 148°18′55.8″E |
Status | Operational |
Opening date | 1966 |
Owner(s) | Snowy Hydro |
Dam and spillways | |
Type of dam | Embankment dam |
Impounds | Geehi River |
Height | 91 metres (299 ft) |
Length | 265 metres (869 ft) |
Dam volume | 1.421 million cubic metres (50.2×10 |
Spillways | 1 |
Spillway type | Uncontrolled bell-mouth spillway |
Spillway capacity | 1,534 cubic metres per second (54,200 cu ft/s) |
Reservoir | |
Creates | Geehi Reservoir |
Total capacity | 21,093 megalitres (744.9×10 |
Catchment area | 149 square kilometres (58 sq mi) |
Surface area | 700 hectares (1,700 acres) |
Power Station | |
Operator(s) | Snowy Hydro |
Commission date | 1967 |
Type | Conventional |
Hydraulic head | 460.2 metres (1,510 ft) |
Turbines | 10 |
Installed capacity | 950 megawatts (1,270,000 hp) |
The structure was completed by Thiess Brothers in 1966,[1] and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 that is now run by Snowy Hydro.
The dam is located within what is now the Snowy Valleys local government area. It was constructed by Thiess Bros based on engineering plans developed under contract by the Snowy Mountains Hydroelectric Authority.[2]
The dam wall, comprising 1,421,000 cubic metres (50,200,000 cu ft) of rockfill with an earth core, is 91 metres (299 ft) high and 265 metres (869 ft) long. At 100% capacity the dam wall holds back 21,093 megalitres (744.9×10^6 cu ft) of water. The surface area of Geehi Reservoir is 700 hectares (1,700 acres) and the catchment area is 149 square kilometres (58 sq mi). The uncontrolled bell-mouth spillway has a diameter of 32 metres (105 ft) and is capable of discharging up to 1,534 cubic metres per second (54,200 cu ft/s).[2][3]
Water from Geehi Reservoir and Island Bend Pondage is carried via the Snowy-Geehi tunnel to the Murray 1 power station, which is rated for a hydraulic head of 460.2 metres (1,510 ft) and has a total generating capacity of 950 megawatts (1,270,000 hp) (a net generation of 1,413 gigawatt-hours (5,090 TJ) per annum).[4]
| |
---|---|
Reservoirs |
|
Dams |
|
Power stations |
|
Townships relocated |
|
Company towns |
|
Tourist facilities |
|
Water supply in New South Wales, Australia | |||||||||
---|---|---|---|---|---|---|---|---|---|
Dams and reservoirs in Greater Metropolitan Sydney |
| ||||||||
Sewerage and other water infrastructure in Greater Metropolitan Sydney |
| ||||||||
Regional dams and reservoirs |
| ||||||||
Other water sources |
| ||||||||
Companies and government agencies |
| ||||||||
Regulators |
| ||||||||
Historical |
|