Benmore Dam is the largest dam within the Waitaki power scheme, located in the Canterbury Region of New Zealand's South Island. There are eight other power stations in the Waitaki Power Scheme.

Benmore Dam
Location of Benmore Dam in New Zealand
LocationCanterbury Region, New Zealand
Coordinates44°33′50.92″S 170°11′49.92″E
Construction cost$62 million
Dam and spillways
Type of damEarth-filled dam
ImpoundsWaitaki River
Height110 m (360 ft)
Length823 m (2,700 ft)
Width (crest)10.6 m (35 ft)
Width (base)490 m (1,610 ft)
Dam volume28 million tonnes
Spillway capacity3,400 km3 (820 cu mi)
Reservoir
CreatesLake Benmore
Total capacity1.25 km3 (1,010,000 acre⋅ft)
Surface area75 km2 (29 sq mi)
Maximum water depth102 m (335 ft)
Power Station
Operator(s)Meridian Energy
Commission date1965
Hydraulic head92 m (302 ft)
Turbines6 x 90 MW (120,000 hp)
Installed capacity540 MW (720,000 hp)
Annual generation2,215 GWh (7,970 TJ)

The dam is the largest earth-fill (zoned embankment dam) water-retaining structure in New Zealand. Its core is low permeability clay material, supported by two massive shoulders of river gravel. Lake Benmore has a volume of 1.25 billion cubic metres, about 1.5 times as much water as Wellington Harbour. The dam's spillway can cope with over 6,000 cubic metres of water per second, about 20 times the mean river flow.

Dam of Benmore hydropower station
Dam of Benmore hydropower station
Lake below Benmore hydropower station
Lake below Benmore hydropower station

Benmore Power Station


With a generating capacity of 540 megawatts (720,000 hp), Benmore Power Station is the second largest [1] hydro station in New Zealand behind Manapouri, and the largest dam in the country.

The $62 million construction of the dam and hydroelectric station began in 1958. It was commissioned in 1965, and officially opened by Prime Minister Sir Keith Holyoake on 15 May that year.[2] It was built for the New Zealand Electricity Department; since 1999 it has been owned and operated by Meridian Energy.[2]

From 2008 to 2010 the six turbines are being refurbished at a cost of $67 million. This will enable a 6% reduction in water use for the same generation capacity, increasing annual generation by 70 GWh (250 TJ). New switchboards and an upgrade to the switchyard are also planned.[2]

Benmore is the South Island terminus of the HVDC Inter-Island link between the North and South Islands of New Zealand. The HVDC converter stations are on the west side of the tailrace, and convert 220 kV AC power to ±350 kV DC for the 610 km (380 mi) journey to the North Island converter station at the Haywards in Lower Hutt.


Otematata


Otematata is the small town that was created to support workers who constructed the dam, and their families. The town was constructed by the Ministry of Works, which residents called "Uncle Mow" or "Big Mow" as it provides every feature, including social activities and clubs, and expelled criminals from the town. After the dam was constructed, much of the village was dismantled. Many of the houses, which had been trucked in from Roxborough, were trucked away again and moved to the next site in Twizel.[3]

Today Otematata supports the dam, although with advances in technology the staffing needed to maintain the dam is drastically smaller. Due to this the town is now a small holiday community, with only around 200 permanent residents. The dam is about 8 kilometres (5.0 mi) up the valley from the township.


Key statistics


Benmore Dam from the south lookout, near the spillway

Transmission


Benmore is a major switching point in the New Zealand national grid and one of two major switching stations in the Waitaki Valley (the other being Twizel sub-station). The importance is largely due to the location at Benmore of the southern terminal station of the HVDC Inter-Island link.

The main AC switching station is on the east bank of the tailrace, and electricity generated at Benmore Power Station is injected into the national grid here. Three major 220 kV lines containing five circuits run from the Benmore substation. Clockwise from south, they are:[4]

The HVDC converter stations are located on the west side of the tailrace, connected to the AC switching station by lines over the tailrace. The -350 kV thyristor Pole 2 has its valve hall on the south side of the site. A new +350 kV thyristor Pole 3 was commissioned in 2013 to replace the ageing Pole 1, and its valve hall is located adjacent to the existing Pole 2 valve hall.


See also



References


  1. "Benmore dam hydro station".
  2. Bruce, David (30 October 2008). "Benmore gets more with first full rebuild". Otago Daily Times. Retrieved 2008-10-30.
  3. "Power for the People". RNZ. 2015-05-11. Retrieved 2020-02-09.
  4. "Maps and Diagrams". Transpower New Zealand. Retrieved 18 July 2017.

Further reading





На других языках


[de] Kraftwerk Benmore

Das Kraftwerk Benmore (Benmore Hydro Station) ist ein Laufwasserkraftwerk auf der Südinsel von Neuseeland. Das Kraftwerk ist eines von acht Kraftwerken des Waitaki Hydro Scheme, eines groß angelegten Wasserkraftprojekts in der Region Canterbrury.[1]
- [en] Benmore Dam

[fr] Barrage de Benmore

Le barrage de Benmore est un barrage hydroélectrique situé sur le cours du fleuve Waitaki dans l'île du Sud en Nouvelle-Zélande. Mis en service en 1965, sa construction a formé le lac Benmore en amont.



Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2024
WikiSort.org - проект по пересортировке и дополнению контента Википедии