The Karcham Wangtoo Hydroelectric Plant is a 1,091 megawatts (1,463,000 hp)[2] run-of-the-river hydroelectric power station on the Sutlej River in Kinnaur district of Himachal Pradesh state of India.[3]

Karcham Wangtoo Dam
Location of Karcham Wangtoo Dam in India
Karcham Wangtoo Hydroelectric Plant (Himachal Pradesh)
Official nameKarcham Wangtoo Hydroelectric Plant
Coordinates31°32′35.53″N 78°00′54.80″E
PurposePower
StatusOperational
Construction began2005
Opening date2011
Construction costRs. 7,150 crore ($687 million USD 2011)
Owner(s)JSW Group
Dam and spillways
Type of damGravity dam
ImpoundsSutlej River
Height98 m (322 ft)
Length177.8 m (583 ft)
Elevation at crest1,813 m (5,948 ft)
Reservoir
Surface area588 m2 (0 acres)
Normal elevation1,810 m (5,938 ft)
Power Station
Commission date2011
Hydraulic head298 m (978 ft) (gross)
Turbines4 x 250 MW Francis-type
Installed capacity1,000 MW
Annual generation4,560 GWh est.[1]

Etymology


The dam and power station are located between the villages of Karcham and Wangtoo where the plant also gains its name.[3]


History


In 1993, and after years of delays, the Jaypee Karcham Hydro Corporation Limited of Jaypee Group signed a memorandum of understanding to develop the dam. On 18 November 2005, the construction on the power station began.[3] In 2015, Jaypee Group sold out Karcham Wangtoo Project to JSW Group.[4]

In May 2011, the first generator was commissioned, the second in June and the final two in September.[5]


Technical details


The 98 m (322 ft) tall dam at Karcham (31°30′00.26″N 78°10′39.54″E) diverts a substantial portion of the Sutlej into a 10.48 m (34.4 ft) diameter and 17.2 km (10.7 mi) long headrace tunnel to the underground power station downstream at Wangtoo. At the station, the water powers four 250 MW Francis turbine-generators before it is sent back into the Sutlej via a 1.2 km (0.75 mi) long tailrace tunnel. The difference in elevation between the dam and the power station affords a gross hydraulic head of 298 m (978 ft). Water not diverted by the dam is sent over the spillway and down the normal course of the river. The main spillway is along the crest of the dam and is controlled by six radial gates.[6]

Just upstream of the dam is the 300 MW Baspa II Hydroelectric Plant and downstream of the Karcham Wangtoo is the 1,500 MW Nathpa Jhakri Dam.[3]


Transport


In 2020, construction of a new nearly 150 km long "Karcham-Harsil Road" was announced. It will link Karcham on NH-5 to Harsil on NH-34, both in Himachal Pradesh. This new road, to be constructed by Border Roads Organisation (BRO) at a cost between Rs 2,500 to Rs 3,000 crore, is in addition to the 73 previously approved India-China Border Roads (ICBR). It will cut down present 450 km long distance, which take nearly 16 hours, to just nearly 150 km or 2 to 3 hours. Since Karcham and Harsial are 26 km and 52 km away from the Line of Actual Control (LAC) respectively, the new road will also enable the faster deployment of troop.[7]


See also



References


Map all coordinates using: OpenStreetMap 
Download coordinates as: KML
  1. "Hydroelectric Power Plants in India - Himachal Pradesh". IndustCards. Retrieved 14 June 2013.
  2. Jai, Shreya. "CEA restricts capacity of JP hydro plant sold to JSW". Retrieved 28 May 2016.
  3. "Hydroelectric Project in Kinnaur District in Himachal Pradesh" (PDF). UN Clean Development Mechanism. Retrieved 14 June 2013.[permanent dead link]
  4. "JSW Energy buys JP Power's 2 hydro projects for Rs 9,700 crore - Times of India". The Times of India. Retrieved 28 May 2016.
  5. "Karcham Wangtoo Hydroelectric Project". Global Energy Observatory. Retrieved 14 June 2013.
  6. "Jaypee Karcham Hydro Corporation Limited". Jalindia. Archived from the original on 1 April 2014. Retrieved 14 June 2013.
  7. Modi govt’s infra push along China border — 2 new roads, alternate route to Daulat Beg Oldie, The Print, 15 September 2020.

На других языках


- [en] Karcham Wangtoo Hydroelectric Plant

[fr] Barrage de Karcham Wangtoo

Le barrage de Karcham Wangtoo est un barrage dans le Himachal Pradesh en Inde sur le Sutlej. Il est associé à une centrale hydroélectrique de 1 000 MW. Sa construction a démarré en 2005 et s'est terminé en 2011. En 2021, sa puissance est augmentée à 1 045 MW[1].



Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2024
WikiSort.org - проект по пересортировке и дополнению контента Википедии