The Dadin Kowa Dam is situated in Yamaltu Deba local government area of Gombe State in the North east part of Nigeria. The dam is located about 35 kilometers to the east of Gombe town, and provides drinking water for the town. The dam was completed by the federal government in 1984, with the goal of providing irrigation and electricity for the planned Gongola sugar plantation project.[1]

Dadin Kowa Dam
Gongola River
LocationGombe State, Nigeria
Coordinates10°19′19″N 11°28′54″E
Opening date1984
Dam and spillways
ImpoundsGongola River
Reservoir
CreatesLake Dadin Kowa
Total capacity800 million m3
Surface area300 km2

Description


The reservoir which is designed to have a water capacity of 2.8 billion cubic meters making it the 2nd largest dam in the countryas[2][3]and a surface area of 300 square kilometers, and has potential as a source of fish.[4][5] 26,000 people were displaced by the reservoir, receiving little assistance for resettlement.[6] The reservoir is suspected to be a major breeding site for black flies, which cause river blindness.[7]

The water supply project was built at a cost of about N8.2billion by CGC Nigeria, a Chinese company, completed during the administration of Governor Mohammed Danjuma Goje. In 2010 it was providing about 30,000 cubic meters daily, treated at a plant three kilometers from the dam before being piped to storage reservoirs in Gombe while supplying communities along the road.[8]

In August 2001 the federal government announced that it would spend $32 million to complete the Dadin Kowa Dam power generation facilities.[9] In March 2009 N7 billion was allocated to complete the hydro-electrical generation component of the dam, and another N500 million to complete the canal, which would irrigate 6,600 hectares of farmland.[5] In August 2009 Governor Goje said that less than N600 million was needed to provide the canals.[10]

After prioritization by the government for completion of the project in 2016, the ministry concluded completion of the dam in August 2021.[11] As of September 2021, the Ministry of Power hadn't enabled full use of energy from the dam as part of the grid.[12][13]


References


  1. "Dadin Kowa Dam". Goodlife. Retrieved 2010-05-23.
  2. "Nigeria ICRC PPP Platform". ppp.icrc.gov.ng. Retrieved 2022-10-09.
  3. "Gombe community awaits 32-year power project's inauguration". Punch Newspapers. 2020-02-09. Retrieved 2022-10-09.
  4. Timawus Mathias (17 February 2010). "Jonathan Needs More Than Good Luck". Daily Trust. Retrieved 2010-05-23.
  5. "FG earmarks N7bln for Dadin Kowa Dam project in Gombe". Radio Kwara. 2009-03-28. Archived from the original on 2011-07-15. Retrieved 2010-05-23.
  6. William Mark Adams (2001). Green development: environment and sustainability in the Third World. Routledge. p. 238. ISBN 0-415-14766-2.
  7. "Gombe Fights River Blindness". Leadership (Abuja). 29 October 2007. Archived from the original on 2011-07-14. Retrieved 2010-05-23.
  8. Mike Ogbu (23 March 2010). "Gombe Rural Communities Enjoy Potable Water -Isa". Daily Independent. Retrieved 2010-05-23.
  9. Kingsley Nwezeh (29 August 2001). "FG to Spend $32m On Gombe Dam Project". ThisDay. Retrieved 2010-05-23.
  10. Segun Awofadeji (29 August 2009). "Goje Urges FG On Mambila Power Project". ThisDay.
  11. "Governor Inuwa makes case for full utilisation of completed Dadinkowa Hydro power plant". Tribune Online. 2021-09-14. Retrieved 2022-03-11.
  12. "Gombe: Governor makes case for Dadin Kowa multi-purpose dam". The Sun Nigeria. 2021-09-13. Retrieved 2022-03-11.
  13. "Governor Inuwa makes case for full utilisation of completed Dadinkowa Hydro power plant". Tribune Online. 2021-09-14. Retrieved 2022-03-11.

На других языках


- [en] Dadin Kowa Dam

[es] Embalse de Dadin Kowa

El embalse de Dadin Kowa se encuentra en el río Gongola, en el estado de Gombe, al nordeste de Nigeria, en el departamento de Yamaltu-Deba. Es un afluente del río Benue, principal tributario del río Níger.



Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии