Mphanda Nkuwa Dam is a proposed hydroelectric dam on the Zambezi River in Mozambique. The dam would be located about 60 kilometres (37 mi) downstream of the existing Cahora Bassa Dam near the city of Tete. Its power station would have a capacity of 1,500 megawatts.[1]
Mphanda Nkuwa Dam | |
---|---|
Country | Mozambique |
Coordinates | 15°59′59″S 33°26′05″E |
Dam and spillways | |
Type of dam | Concrete gravity |
Impounds | Zambezi River |
Height | 103 m (338 ft) |
Reservoir | |
Surface area | 97 km2 (37 sq mi) |
Maximum length | 60 km (37 mi) |
Installed capacity | 1,500 MW |
The dam would be 103 metres (338 ft) high[2] and flood approximately 97 square kilometres (24,000 acres) of the Zambezi valley.[1] The estimated cost of the project is US$4.2 billion.[3] Once the dam is completed, it is expected that most of the generated power will be sold to South Africa, because of the lack of transmission infrastructure in Mozambique.[1]
The proposed dam is highly controversial because it would force the relocation of 1,400 families, and affect the livelihoods of a further 200,000 people downriver. Because the dam would be operated on a peaking basis, large daily fluctuations in river flow would ruin existing irrigation systems and affect aquaculture in the river's extensive delta.[2] The United Nations has described this project as the "least environmentally acceptable major dam project in Africa."[4]
In 2015, the Mozambique government announced it would start construction of the dam. The construction was contracted to Camargo Corrêa of Brazil, INSITEC of Mozambique, and Electricidade de Moçambique.[3] In 2020, Mozambique President Filipe Nyusi wished construction of the dam started before 2024.[5]
In 2022, the International Finance Corporation (IFC), a subsidiary of the World Bank Group, signed agreements with the Mozambican government, indicating willingness to participate in the development of this renewable energy project.[6]
In October 2022, the Mozambican government short=listed seven companies and consortia, who will be allowed to visit the site and then formulate detailed designs and plans to develop the dam and power station.[7] The table below, outlines the entities vying for the engineering, procurement and construction (EPC) contract for his project.[8]
Rank | Developer | Domicile | Notes |
---|---|---|---|
1 | Électricité de France (EDF) | France | [8] |
2 | Longyuan Power Overseas Investment and PowerChina Resources | China | [8] |
3 | Scatec | Norway | [8] |
4 | Sumitomo Corporation and Kansai Electric Power | Japan | [8] |
5 | WeBuild Group | Italy | [8] |
6 | ETC Holdings Mauritius | Mauritius | [8] |