geo.wikisort.org - ReservoirThe Șugag Dam is a large hydroelectric dam on the river Sebeș situated in Romania. It creates the reservoir Lake Tău Bistra. The project was started and finished in the 1980s and it was made up by the construction of a double arched concrete dam measuring 78 m (256 ft) high. The facility generates power by utilizing two turbines, totalling the installed capacity to 150 MW, and generating 260 GWh of electricity annually.
Dam in Alba County, Romania
Șugag Dam |
---|
Location | Tău Bistra, Alba County, Romania |
---|
Coordinates | 45.689°N 23.609°E / 45.689; 23.609 |
---|
|
Type of dam | Double-arch dam |
---|
Impounds | Sebeș |
---|
Height | 78 m (256 ft) |
---|
|
Total capacity | 21,000,000 m3 (740,000,000 cu ft) |
---|
Surface area | 0.81 km2 (0.31 sq mi) |
---|
|
Installed capacity | 150 MW |
---|
Annual generation | 260 GWh |
---|
See also
External links
High Capacity Power stations in Romania |
---|
(more than 100 MW installed capacity) |
Thermal |
- Turceni - 1,650 MW
- Rovinari - 1,320 MW
- Mintia-Deva - 1,285 MW
- Crivina - 990 MW
- Brazi - 950 MW
- Petrom Brazi - 860 MW
- Iernut - 800 MW
- Sărdănești - 700 MW
- Borzești - 655 MW
- Brăila - 646 MW
- Ișalnița - 630 MW
- Bucharest South - 550 MW
- Galați - 535 MW
- Doicești - 320 MW
- Bucharest West - 310 MW
- Craiova II - 300 MW
- Paroșeni - 300 MW
- Alum Tulcea - 250 MW
- Borzești II - 250 MW
- Fântânele - 250 MW
- Halânga - 247 MW
- Buzău - 207 MW
- Oradea - 205 MW
- Govora - 200 MW
- Progresu - 200 MW
- Brazi II - 150 MW
- Giurgiu - 150 MW
- Iaşi I - 150 MW
- Pitești Sud - 136 MW
- Arad - 112 MW
- Brașov - 100 MW
- Grozăvești - 100 MW
- Iaşi II - 100 MW
- Holboca - 100 MW
- Palas - 100 MW
- Suceava - 100 MW
|
---|
Hydroelectric | |
---|
Nuclear |
- Cernavodă Nuclear Power Plant - 1,300 MW
|
---|
Wind farms |
- Sinus Holding - 700 MW
- Fântânele-Cogealac - 600 MW
- Blackstone - 500 MW
- Deleni - 500 MW
- Eolica Cogealac - 448 MW
- Mărişelu - 300 MW
- Eolica Sǎcele - 252 MW
- Eolica Casimcea - 244 MW
- Văcăreni - 240 MW
- Verbund Casimcea - 225 MW
- Green Energy - 200 MW
- Pechea - 150 MW
- Sabloal Valea Dacilor - 147 MW
- EDP Cernavodă - 138 MW
- Eolica Beidaud - 128 MW
- Eolica Baia - 126 MW
- Eolica Sarichioi - 102 MW
- Gheorgheni - 100 MW
|
---|
Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии